Customers

wpcf-client-logo
wpcf-client-logo
wpcf-client-logo
wpcf-client-logo
wpcf-client-logo
wpcf-client-logo
wpcf-client-logo
wpcf-client-logo
wpcf-client-logo
wpcf-client-logo
wpcf-client-logo
wpcf-client-logo
wpcf-client-logo
wpcf-client-logo

Case Studies

Case Study – Metronit

Over 250,000 riders travel on Israel’s northern routes – including the cities of Haifa, Nesher, and Krayot. Over the years, this created major overload of cars and busses, which added to the congestion and overall pollution in the area. To mend the situation the Israeli Department of Transportation (DOT) issued a tender for a “Bus Rapid Transit”, or the “Metronit” as called locally. The goal was to improve capacity and reliability compared to a conventional bus system.

THE FULL STORY

Download full story
Case Study – Metropoline

Although Optibus OnSchedule™ has been used by Metropoline for only a few months, the bus company reports a positive impact on operational expenditure, due, amongst other factors, to the elimination of deadhead trips. Optimized vehicle schedules enabled Metropoline to reduce their fleet size, while improving quality of service, and avoiding penalties from the Ministry of Transport for delayed or cancelled trips. Most importantly, drivers enjoy better working conditions and convenient working hours with regular breaks in accordance with labor regulations, which assures their loyalty to Metropoline.

THE FULL STORY

Download full story
Case Study – Nateev Express

Using Optibus OnSchedule™, Nateev Express compared multiple schedule scenarios to determine the
one that delivered maximum efficiency while matching its operational environment:

  • Optimized depot locations and capacity could save over 600,000 km of deadhead trips per year
  • Fleet size reduced by 10%
  • Cost-efficient application of rest period regulations

THE FULL STORY

Download full story
Case Study – Kavim

“Using Optibus’ services we were able to quickly create and test different optimized schedule alternatives, evaluate their actual cost, and prepare a winning applicable plan. This helped us to significantly reduce our operational costs”

THE FULL STORY

Download full story